Calendar

Previous October Next Previous 2013 Next
Mo. Tu. We. Th. Fr. Sa. Su.
30 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3

Affiliations

Links

Sensor installation

Grenoble rocade sud (A41), direction west, on-ramp preceding exit 27
April 23, 2013, 10 PM

Marking of the spot to be dug in the center of the on-ramp

Excavating the hole in the asphalt with an electric drill

Crushing the stones below the asphalt layer with a jackhammer

The sensor is positioned in the hole (a 2 € coin is shown as a comparison)

The sensor is completely immersed in a solidifying resin (with the arrow pointing in the traffic direction)

Courtesy of DIR-CE and Karrus SAS