Sensor installation
Grenoble rocade sud (A41), direction west, on-ramp preceding exit 27
April 23, 2013, 10 PM
Marking of the spot to be dug in the center of the on-ramp
Excavating the hole in the asphalt with an electric drill
Crushing the stones below the asphalt layer with a jackhammer
The sensor is positioned in the hole (a 2 € coin is shown as a comparison)
The sensor is completely immersed in a solidifying resin (with the arrow pointing in the traffic direction)
Courtesy of DIR-CE and Karrus SAS